We handle the approvals, so you don't have to.

Dubai Municipality, Civil Defence, and building permits — managed start to finish by a licensed, DED-registered contractor. You get the fit-out; the regulators are our problem.

NOVA ANTHILLS INTERIORS LLCLICENSED · DED-REGISTEREDSHEET 02 — APPROVALS

THE AUTHORITIES

Every regulator a fit-out touches. We deal with all of them.

DMWE FILE

Dubai Municipality

Decor and fit-out permits, technical drawing approvals, and the completion certificate that closes the job out.

YOU PROVIDE — NOTHING. WE PREPARE AND SUBMIT ALL DRAWINGS.

DCDWE FILE

Dubai Civil Defence

Fire and life-safety approval for layouts, materials, alarm and suppression systems — before and after the build.

YOU PROVIDE — NOTHING. OUR ENGINEERS HANDLE DESIGN + INSPECTION.

NOCWE FILE

Building owner / FM

No-objection certificates, work-hour permissions, and hoarding, access and delivery arrangements with your landlord.

YOU PROVIDE — ONE INTRODUCTION TO YOUR BUILDING MANAGEMENT.

DEDWE FILE

Dept. of Economic Development

Our own standing: trade licensing and contractor registration that makes us eligible to file on your behalf.

YOU PROVIDE — NOTHING. THIS ONE IS ENTIRELY ABOUT US.

DIVISION OF WORK

The entire paper trail sits on our side of the table.

YOUR SIDE — 3 ITEMS

01

Sign the contract and approve the design.

02

Introduce us to your building management.

03

Accept handover when the space is ready.

OUR SIDE — EVERYTHING ELSE

01

Prepare permit-grade drawings and technical submissions.

02

File with Dubai Municipality and track the application.

03

Obtain Civil Defence fire and life-safety approval.

04

Secure landlord NOCs and site work permits.

05

Host every inspection and clear every comment.

06

Close out the completion certificate and hand you the file.

YOU SIGN THE CONTRACT. WE SIGN EVERYTHING ELSE.

FILING SEQUENCE

What happens between "signed" and "site start".

STEPFILINGTYPICAL TIME
01

Permit-grade drawings

We convert the approved design into the technical drawing set the authorities require — layouts, MEP, fire strategy.

3–5 DAYS
02

Landlord NOC

We obtain your building management's no-objection certificate and agree site access and working hours.

2–5 DAYS
03

Dubai Municipality permit

Decor permit submission, fee payment, and any technical comments — answered by us, not forwarded to you.

5–10 DAYS
04

Civil Defence approval

Fire and life-safety review of the design; systems inspected again at completion before sign-off.

5–10 DAYS
05

Completion certificate

Final inspections, as-built drawings, and formal close-out — the file that proves your space is fully compliant.

AT HANDOVER

TIMES ARE TYPICAL FOR OFFICE FIT-OUTS IN DUBAI. WE CONFIRM A DATED PLAN AT CONSULTATION.

ON RECORD

Licensed to do this — not just willing to.

Approvals can only be filed by a contractor the authorities recognise. Our registrations are current, on record, and verifiable — ask and we'll share the certificates before you sign anything.

REGISTRATION LEDGERVERIFIED

Trade license

DEPT. OF ECONOMIC DEVELOPMENT — DUBAI

ON RECORD

Contractor registration

DUBAI MUNICIPALITY — DECOR WORKS

ON RECORD

Civil Defence registration

DCD — APPROVED INSTALLER

ON RECORD

Public liability insurance

CURRENT POLICY — COPY ON REQUEST

ON RECORD

CERTIFICATE COPIES AVAILABLE ON REQUEST.

START A PROJECT

Bring us the space. The paperwork stops being yours today.

Send a floor plan, photos, or just the address — we'll reply the same working day with a site-visit slot and a clear next step.